Job No. 9 - Sub

Vessel Name on Arrival: 
Job No. 9 - Sub
Vessel Type: 
Test Section
Draught For'd: 
11' 3"
Draught Aft: 
10' 0"
Arrival Date: 
31/10/1946
Breakup Started: 
15/04/1947
Date First Beaching: 
27/03/1947
Breakup Completed: 
10/05/1947
Other Information: 

 
No details are available at present on this particular structure - thought to have possibly been a Test Section of a submarine.  Although drawing a considerable draught on arrival, the breaking operation took only some four weeks, so it is assumed it could not have been of any significant size or tonnage.