Job No. 9 – Sub

Vessel name on Arrival: Job No. 9 - Sub

Original Builder:

Original Yard No:

Official Number:

Vessel Type: testsection

GRT:

Year Built:

Arrival Date: 31/10/1946

Breakup Started: 14/04/1947

Date First Beached: 26/03/1947

Date Breakup Completed: 09/05/1947

Draught For’d: 11' 3"

Draught Aft: 10' 0"

Name Changes:

Other Information:

 

No details are available at present on this particular structure – thought to have possibly been a Test Section of a submarine.  Although drawing a considerable draught on arrival, the breaking operation took only some four weeks, so it is assumed it could not have been of any significant size or tonnage.